FAQ
Q: What is your delivery time and shipping method?
A: Standard lead time is 2–4 weeks for most products. We offer worldwide shipping via sea, air, or express courier, with full tracking and customs documentation support.
Q: Do you provide after-sales support?
A: Yes, we offer 24/7 technical support, installation guidance, and warranty services for all our products. Our team can assist with on-site troubleshooting if needed.
Q:What materials do you use for your valves and equipment?
A:We use high-quality carbon steel, alloy steel, and stainless steel (including 4130, 4140, and 316L) for critical components. We also offer specialized materials like duplex stainless steel and high-alloy options for corrosive or high-temperature well environments.
Q: What products do you specialize in?
A: We specialize in API-certified oilfield equipment, including choke valves, mud valves, check valves, wellhead assemblies, Christmas trees, and manifolds for drilling, completion, and production operations. We also offer OEM/ODM custom solutions for high-pressure fluid control systems.
Q: Are your products API certified?
A: Yes, all our core products comply with API 6A, API 6D, and ISO 9001 standards. We provide full test reports, material certificates, and compliance documents for every order.
Q: Can you provide custom OEM/ODM solutions?
A: Absolutely. Our engineering team can design valves and manifolds based on your specific pressure ratings, materials, and operational requirements. We support custom packaging and branding as well.
Our Projects
Latest Works
Project 1: API 6A Wellhead Assembly for Onshore Oilfield
A complete API 6A wellhead assembly delivered to a major onshore oilfield operator, including casing heads, tubing heads, and valves rated for 10,000 PSI. The system was designed for high-pressure well control and long-term production reliability.
Project 2: Custom Choke Manifold for Fracturing Operations
A custom choke manifold system engineered for high-pressure fracturing operations, featuring multiple JLG2-1165K choke valves and erosion-resistant trim. The system reduced downtime and improved flow control efficiency for the client.
Project 3: Mud Valve Package for Drilling Operations
A full package of LP and XXH series mud valves supplied to a drilling contractor, including 2″ and 4″ sizes for both auxiliary and main mud lines. The valves’ wear-resistant design significantly extended service life under harsh conditions.